From the first site survey to the final pressure test, this page maps the sequence we follow when a noble gas system starts behaving unpredictably.

How a Troubleshooting Engagement Unfolds

Field Deployment Sequence

Each engagement follows a fixed diagnostic path, from initial line inspection to final pressure certification. The timeline below reflects how our crews operate on-site at manufacturing plants across Malaysia.

Week 1 - Site Survey and Line Mapping

Technicians document every valve, regulator, and flange along the noble gas delivery path. Pressure ratings and existing leak records are logged before any component is touched.

Week 2 - Baseline Pressure Testing

Isolated sections undergo decay testing to establish current loss rates. This gives the maintenance team a measurable reference point before remediation work begins.

Week 3 - Component Replacement and Re-torquing

Faulty seals, worn diaphragms, and loose connections are addressed in order of severity. Each replacement is tagged with the date and the technician's initials for traceability.

Week 4 - Final Certification and Handover

The system is re-tested and results are compared against the baseline. A written report is handed to the plant engineer, including recommended inspection intervals for the next twelve months.

Support Channels and Response Windows

Every troubleshooting engagement includes a direct line to the engineers who know your gas system. Response times are tied to the severity of the fault and the stage of your service contract.

Read the FAQ before you call

What Each Stage of the Timeline Delivers

The engagement runs in four defined phases. Each one has a concrete output, so you know what to expect before we move to the next step.

Site Survey and Gas Line Mapping

We document every valve, regulator, and connection point in your noble gas delivery system. You receive a complete map of the infrastructure before any work begins.

Pressure and Purity Baseline

We measure current operating pressure, flow rates, and gas purity across the system. This baseline tells us where the real losses are, not where they appear to be.

Root Cause Isolation

Using pressure decay tests and mass spectrometry, we isolate the exact component causing the fault. You get a written diagnosis with the evidence behind it.

Remediation and Re-Testing

We replace faulty parts, re-torque connections, and re-run the full test sequence. The final report compares your new readings against the original baseline.

Maintenance Handover

You receive a maintenance schedule tailored to your equipment, plus a checklist your own engineers can follow between our visits. No vague recommendations.